Asset 7@4x
Asset 7@4x
Asset 7@4x

Adjusting for spherical bearings bridge (HIGH SPEED) - Heavy Lifting

Location: Zewail City, 6 October, Egypt

2024

Year of completion

Adjusting the spherical bearing by lifting the concrete bridge

Beam Weight at each axis:

180 Tons

Number of bearings at each axis:

2 Bearings

Project Owner

The National Road Authority (NRA), Egypt

Added Value to the Customer:

· The operation enhanced the durability and stability of the structure, ensuring long-term reliability and minimizing future maintenance needs, reflecting a cost-effective and efficient solution for the customer.

Engineering Concept:

· The operation involved lifting a 180-ton concrete beam and adjusting the inclination of the spherical bearing to restore equilibrium. This required precise analysis, advanced tools, and adherence to structural design principles to ensure optimal performance.

Fast Track Solution:

· Weight Management: Hydraulic systems with real-time load monitoring allowed for controlled lifting of the massive beam.

· Precision Adjustment: Skilled engineers utilized cutting-edge devices to achieve the exact realignment of the spherical bearing.

Systems in Use:

· Specialized hydraulic jacks equipped with load-monitoring sensors were used to safely lift the beam. Advanced measurement tools, such as Total Stations, ensured accurate alignment during the adjustment process.

IMG_3904
IMG_4221
IMG_4224
IMG_4227
WhatsApp Image 2024-11-19 at 11.56.09_ee7b3443
previous arrow
next arrow
Shadow
Scroll to Top