Asset 7@4x
Asset 7@4x
Asset 7@4x

Adjusting the spherical bearing (LRT) - Heavy Lifting

Location: Helwan desert road , Egypt

2024

Year of completion

Adjusting the spherical bearing by lifting the concrete bridge.

Beam Weight at each axis:

190 Tons

Number of bearings at each axis:

2 Bearings

Project Owner

The National Road Authority (NRA), Egypt

Added Value to the Customer:

· The operation enhanced structural stability, reduced maintenance needs, and delivered a cost-effective, durable solution.

Engineering Concept:

· The operation involved lifting a 190-ton beam and adjusting the spherical bearing’s inclination to restore balance, requiring precise analysis, advanced tools, and strict engineering standards.>

Fast Track Solution:

· Weight Management: Real-time load tracking enabled controlled lifting.

· Precision Alignment: Advanced tools ensured accurate bearing adjustments.

Systems in Use:

· Hydraulic jacks with load-monitoring sensors ensured safe lifting, while Total Stations guaranteed precise alignment during adjustments.

IMG_3724
previous arrow
next arrow
Shadow
Scroll to Top