Adjusting the spherical bearing’s bridge (High Speed) - Heavy Lifting

Location: 6 October desert road , Egypt

2024

Year of completion

Adjusting the spherical bearing’s bridge by lifting the concrete bridge.

Bridge Weight at each axis:

1600 Tons

Number of bearings at each axis:

2 Bearings

Project Owner

The National Road Authority (NRA), Egypt

Added Value to the Customer:

· The operation delivered enhanced structural stability and resilience, significantly reducing the likelihood of future maintenance while providing a cost-effective, durable solution tailored to the client's needs.

Engineering Concept:

· The project entailed lifting a 1,600-ton bridge and precisely adjusting the spherical bearing’s inclination to achieve structural balance. This operation demanded meticulous planning, advanced engineering tools, and adherence to the highest industry standards to ensure flawless execution.

Fast-Track Solution:

· Advanced Weight Management: High-capacity hydraulic systems equipped with live load tracking ensured controlled and secure lifting of the bridge.

· Precision Adjustment: Cutting-edge measurement devices and expert engineering practices guaranteed the accurate realignment of the spherical bearing.

Systems in Use:

· State-of-the-art hydraulic jacks, integrated with real-time load-monitoring systems, were utilized to manage the safe and efficient lifting of the bridge.

· Precision alignment tools, such as Total Stations, were employed to achieve exact positioning during the adjustment process.