Cutting Concrete Elements and Skidding 3 Glass Manufacturing Machines

Location: Al Asher, Sharqia Governorate, Egypt.

2024

Year of completion

Cutting concrete slabs, beams, install a steel structure and Skidding 3 Glass Manufacturing Machines inside our client’s Glass Factory

Machines Weight:

30-tons

Machines Length:

6.00 m

Project Owner

Glass Production Factory, Egypt

Added Value to the Customer:

· Review the drawings, visit the work location, and then consult the client on the modifications required to optimize the work process.

· Prepare full work methodology in detail for the entire operation.

· Provide detailed calculation sheets and drawings for our scope of work.

· Observe all required safety procedures before and during work Implementation.

· The job was completed quickly and in approximately half the time specified, taking into account the highest quality standards and with high accuracy.

Engineering Concept:

· The factory began the process of replacement and renovation, and as a result, they needed to replace some glass production machines and transport and install new machines as well.

· Also, we had to remove part of the concrete slabs and beams in order to meet the new coordinates of the new machines and install steel structure instead of the concrete.

Fast Track Solution:

· In the first step, we reviewed the drawings then obtained the required approvals to start manufacturing the steel structure. We had to start this step approximately 3 weeks before the work start date.

· Skidding (shifting) the 1st machine using the hydraulic jacking system and the skidding rails underneath, and moving it out of the factory production hanger.

· For the 2nd machine, we skid (moved) it to the empty space instead of the 1st machine.

· Now we have to prepare the empty space of the 2nd machine. In order to do this, we began the process of cutting the concrete slabs and beams in this area using the Diamond Wire Saw Machines and removing the cutting output outside the production hanger first and foremost.

· After we completed the cutting stage, we began installing the approved steel structural elements such as columns, main beams, secondary beams, and all necessary reinforcements and welds.

· We prepared space of the 2nd machine according to the new coordinates and approved drawings.

· Finally, we began moving the new 3rd machine into place of the 2nd machine.

· The final step was to pour concrete around the machine to close the openings between the steel elements.

Systems in use:

· Skidding System.

· Hydraulic Jacking System.

· Diamond Wire Saw Machines.

· Steel Structure.

WhatsApp Image 2024-07-03 at 2.14.45 PM (2)
WhatsApp Image 2024-07-03 at 2.14.45 PM (3)
IMG_2774
IMG_2779
IMG_2809
IMG_2817
IMG_2836
IMG_2832
IMG_2855
IMG_2898
IMG_2882
IMG_2970
IMG_3029
IMG_3054
IMG_3117
IMG_3153
IMG_3182
IMG_3212
IMG_3218
IMG_3240
previous arrowprevious arrow
next arrownext arrow
Shadow
Scroll to Top