Elevator's Cores Scaffolding Installation

Location: New Administrative Capital – Banks complex, Egypt

Banks: Central Bank of Egypt, QNB, Faisal Islamic Bank, United Arab Bank.

2022

Year of completion

Supply and install of H-Frame system for rent as access
scaffolding inside each elevator core. Some cores are
single which contains only one elevator and others have
dual elevators.

The number of elevator cores

39

Total Access Height:

60.00 m

Platform Levels:

Each 3.00 m high

Project Owner

Armed Forces Engineering Authority

Main Contractor

Mitsubishi Corporation

Added Value to the Customer:

· Delivery of materials Just-in-time to avoid unnecessary delays.

· Applying high safety standards during the installation, dismantling & storage.

· Smooth work sequences on site.

· The scaffolding rental system is an economical solution for our customers.

· The scaffolding system is easy to use and can be installed anywhere, especially in narrow areas.

Engineering Concept:

Access scaffolding to be installed entirely inside 39 elevator cores (single or double) to give the contractor safe access and an easier way to fix each 3.00m high an UBN steel beams that will support the subsequent installation of the elevators

Supplying and installation of the H-Frame system as access scaffolding are required.

Fast Track Solution:

· Supplying the required amount of materials on time to avoid unwanted delays.

· Take into consideration a high safety standards to ensure the workers safety through the entire operation.

· Install the access scaffolding as per the design and calculations including all the safety and Anti-fall items such as mandrills and handrails and toe boards.

· The dismantling process was carried out carefully and safely.

· Logistics planning and efficient storage through dismantling and shifting of scaffolding materials from one core to another.

· We have implemented a good distribution of tasks and efficient site planning to increase productivity.

· Full cooperation and coordination during work processes through the on-site Fast Track Project Manager and our client to ensure quality and best results.

Systems in use:

·H-Frame System.