Factory’s slab Supporting and Shoring

Location: Cairo, Egypt

2023

Year of completion

Supporting the factory slab against any failure that may occur during the maintenance process of machines using the small equipment located above it.

Project Owner

Glass Factory, Egypt

Added Value to the Customer:

· A detailed work methodology to clearly define the scope of work.

· Provide detailed calculation sheets.

· Erect and dismantle the system in a safe way.

Engineering Concept :

Providing temporary support for the factory slab using heavy duty Steel Waler beams and an H-Frame system to bear the additional loads from maintenance work on it. Especially since they used a small Pop-cat during this maintenance process.

Fast Track Soultion :

· Considering high safety standards and continuous coordination of all the work processes through a Fast Track project

· Using Steel Waler beams was a time and cost saving option compared to other solutions, as due to their heavy load bearing we were able to use a larger grid size of the H frame during the construction time.

Systems in use :

· H-Frame System.

· Steel Waler Beams.

IMG_3098
IMG_3100
IMG_3103
IMG_3105
IMG_3106
IMG_3109
IMG_3133
IMG_9484
IMG_9494
IMG_9524
IMG_9528
IMG_9531
IMG_9537
previous arrowprevious arrow
next arrownext arrow
Shadow
Scroll to Top