Heating Furnace Access Scaffolding Platforms

Location: Cairo, Egypt

2024

Year of completion

Install and erection of 3 platforms around the heating furnace (oven) inside the factory.

Project Owner

Glass Factory, Egypt

Added Value to the Customer:

· Provide drawings, and calculation sheets for the platform load capacity.

· Erect and dismantle the scaffolding in a safe way and considering all the customary industrial principles.

· Provide work methodology to clearly define the scope of work.

Engineering Concept:

· High temperature and rough conditions did not prevent us from performing our task with high quality and efficiency.

· Which is the installation of scaffolding platforms for the purpose of using them in maintenance work related to the factory furnace.

Fast Track Solution:

· Depending on the complexity of the area, we started by removing the high-mounted steel platform attached to the furnace so we could begin installing the access platforms .

· Also, we have to install the platforms where we mixed the systems using “tube & fittings” and “H frame system”. After that, we installed the wooden planks on the entire platforms area .

· Considering high safety standards and continuous coordination of all the work processes through a Fast Track project manager on site .

· The work was completed in record time and with high-quality .

Systems in use:

· Tube and Fittings

· H-Frame System

· Wooden Planks

IMG_1695
IMG_1698
IMG_1704
IMG_1707
IMG_1708
IMG_1712
IMG_1714
IMG_1719
IMG_1722
IMG_1723
IMG_1728
IMG_1732
IMG_1733
IMG_1736
IMG_1738
IMG_1739
previous arrow
next arrow
Shadow
Scroll to Top