2024
Year of completion
Install and erection of 3 platforms around the heating furnace (oven) inside the factory.
Added Value to the Customer:
· Provide drawings, and calculation sheets for the platform load capacity.
· Erect and dismantle the scaffolding in a safe way and considering all the customary industrial principles.
· Provide work methodology to clearly define the scope of work.
Engineering Concept:
· High temperature and rough conditions did not prevent us from performing our task with high quality and efficiency.
· Which is the installation of scaffolding platforms for the purpose of using them in maintenance work related to the factory furnace.
Fast Track Solution:
· Depending on the complexity of the area, we started by removing the high-mounted steel platform attached to the furnace so we could begin installing the access platforms .
· Also, we have to install the platforms where we mixed the systems using “tube & fittings” and “H frame system”. After that, we installed the wooden planks on the entire platforms area .
· Considering high safety standards and continuous coordination of all the work processes through a Fast Track project manager on site .
· The work was completed in record time and with high-quality .
Systems in use:
· Tube and Fittings
· H-Frame System
· Wooden Planks