2022
Year of completion
Carrying out the lifting works for an existing steel bridge.
Overall Bridge Weight:
800-tons
Overall Bridge Width:
10.00 m
Overall Bridge Length:
60.00 m
Main Contractor
Nile General Company for Construction and Roads
Added Value to the Customer:
· Fast and continuous working operations.
· Maximum safety during the workflows.
· Systems can be used anywhere.
· Avoiding unnecessary delays.
Engineering Concept:
Implement the lifting operation of the 400-tons steel bridge to replace the damaged and deformed rapper supports.
Fast Track Solution:
· Use of the Hydraulic Jacking System (jacks capacity up to 150 ton).
·Our jacks of suitable capacity (depend on our design and calculations) are placed on the two concrete foundations that support the bridge. Then we start the lifting process until reaching the required height, which allows the contractor to execute the maintenance work.
· Smooth operation with high safety standards in consideration.
· Fast Track supervision during all phases of the solution.
Systems in use:
· Hydraulic Jacking System.