Shifting and orienting TBM

Location:6 October, Hdaek Al-Ahram

2024

Year of completion

Shifting TBM for 190m and making orientation at the center of the tunnel by using skidding and jacking system.

TBM Weight

600 Tons

Project Owner

The National Authority for Tunnels (NAT), Egypt

Added Value to the Customer:

· This operation successfully completed a critical phase of the infrastructure project, ensuring minimal disruption and enhancing the project's overall efficiency.

· The use of innovative systems and precise engineering contributed to a cost-effective, high-quality solution that ensures the project remains on track for timely completion.

Engineering Concept:

· The project involved transporting a Tunnel Boring Machine (TBM) over a distance of 190 meters using the Skidding System. This operation required in-depth analysis and careful planning to manage complex challenges, such as a ground-level difference of over 150 cm.

· The task was executed with precision, ensuring the safe transfer of the TBM from the cradle to the steel bell.

Fast-Track Solution:

· Weight Management: Specialized hydraulic systems were employed to safely support and move the TBM, ensuring stability throughout the operation.

· Precise Movement: The Skidding System, combined with hydraulic lifting units, enabled controlled and accurate positioning of the TBM across the ground difference.

Systems in Use:

· Skidding System: This advanced system was used to facilitate the smooth, controlled movement of the TBM over the specified distance.

· Hydraulic Lifting Jacks: These were utilized to manage the heavy lifting and ensure stability during the process.

WhatsApp Image 2024-11-10 at 15.26.34_7fd9db62
IMG_3974
IMG_3706
IMG_3702
IMG_3687
IMG_3682
IMG_3671
IMG_3663
IMG_3651
IMG_3627
IMG_3527
IMG_3530
IMG_3540
IMG_3566
IMG_3578
IMG_3581
IMG_3597
previous arrow
next arrow
Shadow
Scroll to Top