{"id":214,"date":"2023-02-08T12:41:32","date_gmt":"2023-02-08T12:41:32","guid":{"rendered":"https:\/\/ft-eg.com\/?page_id=214"},"modified":"2024-12-15T09:44:07","modified_gmt":"2024-12-15T09:44:07","slug":"elevators-cores-scaffolding-installation","status":"publish","type":"page","link":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/elevators-cores-scaffolding-installation\/","title":{"rendered":"Elevator&#8217;s Cores Scaffolding Installation"},"content":{"rendered":"\n\n\n<p style=\"font-family: Arial; font-size: medium; color: rgb(255, 255, 255);\"><a href=\"projects\" style=\"color: rgb(255, 255, 255);\">Back To Projects &gt;&gt;<\/a><\/p>\n<h2>Elevator&#8217;s Cores Scaffolding Installation<\/h2>\n<p><span style=\"font-family: Arial; font-size: large; color: rgb(255, 255, 255);\">Location: New Administrative Capital \u2013 Banks complex, Egypt<\/span><br><\/p>\n<p><span style=\"font-family: Arial; font-size: large; color: rgb(255, 255, 255);\">Banks: Central Bank of Egypt, QNB, Faisal Islamic Bank, United Arab Bank.<\/span><br><\/p>\n\n\n\n\n<h2>2022<\/h2>\n<h2>Year of completion<\/h2>\n\n\n<span>Supply and install of H-Frame system for rent as access<\/h6><h6>scaffolding inside each elevator core. Some cores are<\/h6><h6>single which contains only one elevator and others have<\/h6><h6>dual elevators.<\/h6><\/span><h6><\/h6>\n\n\n\n\n<h2>The number of elevator cores<\/h2>\n<h2>39<\/h2>\n\n\n<h2>Total Access Height:<\/h2>\n<h2>60.00 m<\/h2>\n\n\n<h2>Platform Levels:<\/h2>\n<h2>Each 3.00 m high<\/h2>\n\n\n\n\n\n\n\n<h2>Project Owner<\/h2>\n<h2>Armed Forces Engineering Authority<\/h2>\n\n\n\n\n\n\n\n<h2>Main Contractor<\/h2>\n<h2>Mitsubishi Corporation<\/h2>\n\n\n\n\n<h2>Added Value to the Customer:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Delivery of materials Just-in-time to avoid unnecessary delays.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Applying high safety standards during the installation, dismantling &amp; storage.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Smooth work sequences on site.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>The scaffolding rental system is an economical solution for our customers.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>The scaffolding system is easy to use and can be installed anywhere, especially in narrow areas.<\/p>\n\n\n\n\n<h2>Engineering Concept:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Access scaffolding to be installed entirely inside 39 elevator cores (single or double) to give the contractor safe access and an easier way to fix each 3.00m high an UBN steel beams that will support the subsequent installation of the elevators<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Supplying and installation of the H-Frame system as access scaffolding are required.<\/p>\n\n\n\n\n<h2>Fast Track Solution:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Supplying the required amount of materials on time to avoid unwanted delays.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Take into consideration a high safety standards to ensure the workers safety through the entire operation.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Install the access scaffolding as per the design and calculations including all the safety and Anti-fall items such as mandrills and handrails and toe boards.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>The dismantling process was carried out carefully and safely.<\/p>\n<p style=\"font-family: Montserrat; color: rgb(0, 0, 0); font-size: large;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Logistics planning and efficient storage through dismantling and shifting of scaffolding materials from one core to another.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>We have implemented a good distribution of tasks and efficient site planning to increase productivity.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Full cooperation and coordination during work processes through the on-site Fast Track Project Manager and our client to ensure quality and best results.<\/p>\n\n\n\n\n<h2>Systems in use:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7<\/span>H-Frame System.<\/p>\n\n\n\n\n<h2><br><\/h2>\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-214","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/comments?post=214"}],"version-history":[{"count":26,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/214\/revisions"}],"predecessor-version":[{"id":49941,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/214\/revisions\/49941"}],"wp:attachment":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/media?parent=214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}