{"id":243,"date":"2023-02-09T10:42:52","date_gmt":"2023-02-09T10:42:52","guid":{"rendered":"https:\/\/ft-eg.com\/?page_id=243"},"modified":"2024-12-15T09:43:37","modified_gmt":"2024-12-15T09:43:37","slug":"maintenance-of-existing-steel-bridge","status":"publish","type":"page","link":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/maintenance-of-existing-steel-bridge\/","title":{"rendered":"Maintenance of Existing Steel Bridge"},"content":{"rendered":"\n\n\n<p><a href=\"projects\" style=\"color: rgb(255, 255, 255);\">back to projects &gt;&gt;<\/a><\/p>\n<h2>Maintenance of Existing Steel Bridge<\/h2>\n<p><span style=\"font-size: large; font-family: Arial; color: rgb(255, 255, 255);\">Location: Alexandria Port, Egypt<\/span><br><\/p>\n\n\n\n\n<h2>2022<\/h2>\n<h2>Year of completion<\/h2>\n\n\n<h2>Carrying out the lifting works for an existing steel bridge.<\/h2>\n\n\n\n\n<h2>Overall Bridge Weight:<\/h2>\n<h2>800-tons<\/h2>\n\n\n<h2>Overall Bridge Width:<\/h2>\n<h2>10.00 m<\/h2>\n\n\n<h2>Overall Bridge Length:<\/h2>\n<h2>60.00 m<\/h2>\n\n\n\n\n\n\n\n<h2>Project Owner<\/h2>\n<h2>General Authority for Alexandria Port<\/h2>\n\n\n\n\n\n\n\n<h2>Main Contractor<\/h2>\n<h2>Nile General Company for Construction and Roads<\/h2>\n\n\n\n\n<h2>Added Value to the Customer:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Fast and continuous working operations.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Maximum safety during the workflows.<\/p>\n<p><span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span><span style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Systems can be used anywhere.<\/span> <\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Avoiding unnecessary delays.<\/p>\n\n\n\n\n<h2>Engineering Concept:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Implement the lifting operation of the 400-tons steel bridge to replace the damaged and deformed rapper supports.<\/p>\n\n\n\n\n<h2>Fast Track Solution:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Use of the Hydraulic Jacking System (jacks capacity up to 150 ton).<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7<\/span>Our jacks of suitable capacity (depend on our design and calculations) are placed on the two concrete foundations that support the bridge. Then we start the lifting process until reaching the required height, which allows the contractor to execute the maintenance work.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Smooth operation with high safety standards in consideration.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Fast Track supervision during all phases of the solution.<\/p>\n\n\n\n\n<h2>Systems in use:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-align: justify; text-indent: -24px;\">\u00b7&nbsp;<\/span>Hydraulic Jacking System.<\/p>\n\n\n\n\n{&#8220;slider&#8221;:&#8221;12&#8243;,&#8221;temp-title&#8221;:&#8221;Lifting Deformed Slab #7&#8243;,&#8221;title&#8221;:&#8221;&#8221;}\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-243","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/comments?post=243"}],"version-history":[{"count":12,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/243\/revisions"}],"predecessor-version":[{"id":49940,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/243\/revisions\/49940"}],"wp:attachment":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/media?parent=243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}