{"id":48934,"date":"2024-03-28T12:13:01","date_gmt":"2024-03-28T12:13:01","guid":{"rendered":"https:\/\/ft-eg.com\/?page_id=48934"},"modified":"2024-12-15T09:35:30","modified_gmt":"2024-12-15T09:35:30","slug":"cutting-and-lowering-heavy-steel-beam","status":"publish","type":"page","link":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/cutting-and-lowering-heavy-steel-beam\/","title":{"rendered":"Cutting and lowering Heavy Steel Beam"},"content":{"rendered":"\n\n\n<p style=\"color: rgb(255, 255, 255);\"><a href=\"projects\" style=\"color: rgb(255, 255, 255); font-size: medium;\">BACK TO PROJECTS &gt;&gt;<\/a><\/p>\n<h2>Cutting and lowering Heavy Steel\nBeam<\/h2>\n<p class=\"MsoNormal\"><span style=\"font-family:&quot;Arial&quot;,sans-serif;color:#1D1D1D\"><span style=\"font-size: large; font-family: Arial; color: rgb(255, 255, 255);\">Location:\nMostord, Cairo, Egypt<\/span><o:p><\/o:p><\/span><\/p>\n\n\n\n\n<h2>2023<\/h2>\n<h2>Year of completion<\/h2>\n\n\n<h2>The beam was 10 meters height off the ground and above a sensitive production line, we had to cut it off and pull it down safely<\/h2>\n\n\n\n\n<h2>Beam Length<\/h2>\n<h2>9.0 m<\/h2>\n\n\n<h2>Beam Weight<\/h2>\n<h2>1 Ton<\/h2>\n\n\n\n\n\n\n\n<h2>Project Owner<\/h2>\n<h2>Production Factory, Egypt<\/h2>\n\n\n\n\n<h2>Added Value to the Customer :<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;Production line safety was the priority. For this reason, we\nstrictly follow high safety norms and standards during all working processes.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;We have provided a detailed work methodology that includes all\nstages and details of the work.<\/p>\n\n\n\n\n<h2>Engineering Concept :<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">The beam was located above a working production\nline of valuable and expensive export products with total height 10 meters from\nthe ground. We needed to cut it into small pieces so that we could pull these\npieces down one by one without causing any failure in the working process of\nthe production line.<\/p>\n\n\n\n\n<h2>Fast Track Solution :<\/h2>\n<p style=\"font-size: large; font-family: Montserrat;\"><span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;We used the Tube and Fitting System as a shoring and supporting system for the beams. Also, we used it as a platform for\nthe labors.<\/p>\n<p style=\"font-family: Montserrat; color: rgb(0, 0, 0); font-size: large;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;Before starting the cutting stage using the Plasma Cutting Machine,\nwe had to cover the production line with special panels and covers with\nfire-resistant ability.<\/p>\n<p style=\"color: rgb(0, 0, 0); font-family: Montserrat; font-size: large;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;After cutting each part we pull it down using the Blanco.<\/p>\n<p style=\"font-family: Montserrat; color: rgb(0, 0, 0); font-size: large;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;We repeated the process until we pull the entire beam down.<\/p>\n\n\n\n\n<h2>Systems in use :<\/h2>\n<p style=\"color: rgb(0, 0, 0); font-family: Montserrat; font-size: large;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;Tube and Fitting System.<\/p>\n<p style=\"color: rgb(0, 0, 0); font-family: Montserrat; font-size: large;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span>&nbsp;Plasma Cutting Machine.<\/p>\n<p><span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7<\/span><span style=\"font-family: Montserrat; color: rgb(0, 0, 0); font-size: large;\">&nbsp;Blanco and hand pallet.<\/span><\/p>\n\n\n\n\n{&#8220;slider&#8221;:&#8221;13&#8243;,&#8221;temp-title&#8221;:&#8221;Lifting Deformed Slab #7&#8243;,&#8221;title&#8221;:&#8221;&#8221;}\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-48934","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/48934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/comments?post=48934"}],"version-history":[{"count":15,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/48934\/revisions"}],"predecessor-version":[{"id":49934,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/48934\/revisions\/49934"}],"wp:attachment":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/media?parent=48934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}