{"id":48980,"date":"2024-05-14T07:16:36","date_gmt":"2024-05-14T07:16:36","guid":{"rendered":"https:\/\/ft-eg.com\/?page_id=48980"},"modified":"2024-12-15T09:34:57","modified_gmt":"2024-12-15T09:34:57","slug":"skidding-2-glass-manufacturing-machine","status":"publish","type":"page","link":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/skidding-2-glass-manufacturing-machine\/","title":{"rendered":"Skidding 2 Glass Manufacturing Machine"},"content":{"rendered":"\n\n\n<p><a href=\"projects\" style=\"color: rgb(255, 255, 255);\">Back To Projects &gt;&gt;<\/a><\/p>\n<h2>Skidding 2 Glass Manufacturing\nMachine<\/h2>\n<p style=\"font-size: large; font-family: Arial; color: rgb(255, 255, 255);\">Location: Mostord, Cairo, Egypt<\/p>\n\n\n\n\n<h2>2023<\/h2>\n<h2>Year of completion<\/h2>\n\n\n<h2>Skidding and shifting 2 Glass\nManufacturing Machines inside the Factory.<\/h2>\n\n\n\n\n<h2>1<sup>st<\/sup> Machine Weight:<\/h2>\n<h2>35-tons<\/h2>\n\n\n<h2>2<sup>nd<\/sup> Machine Weight:<\/h2>\n<h2>15-tons<\/h2>\n\n\n<h2>1<sup>st<\/sup> Machine Length:<\/h2>\n<h2>10.00 m<\/h2>\n\n\n<h2>2<sup>nd<\/sup> Machine Weight:<\/h2>\n<h2>8.00 m<\/h2>\n\n\n\n\n\n\n\n<h2>Project Owner<\/h2>\n<h2>Production Factory, Egypt<\/h2>\n\n\n\n\n<h2>Added Value to the Customer:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Provide detailed load calculations and work methodology for the\nentire operation.<\/p>\n<p> <span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span><span style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Shifting the machine in a safe manner and observe all required safety measures.<\/span><\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>The task is completed quickly, accurately and with high quality,\nwhich saves time and cost for our client.<\/p>\n\n\n\n\n<h2>Engineering Concept:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0); text-align: justify;\">Our client is one of the largest glass\nmanufacturing companies in Egypt. Due to some of their internal logistical and\norganizational requirements, the need arose to change the storage location of\nthe glass machines and move them to another place.<\/p>\n\n\n\n\n<h2>Fast Track Solution:<\/h2>\n<p style=\"text-align: left;\"><span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span><span style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">We lifted the 1<sup>st<\/sup> machine using the hydraulic jacking\nsystem in order to be able to insert the skidding rails underneath it.&nbsp;<\/span><span style=\"font-size:13.5pt;font-family:&quot;Arial&quot;,sans-serif;mso-fareast-font-family:\n&quot;Times New Roman&quot;;color:black;mso-bidi-language:AR-EG\"><o:p><\/o:p><\/span><\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0); text-align: justify;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Skidding started using our special equipment for a 5-meter lateral movement, then 30 meters in the longitudinal direction, and\nthen again a 7-meter lateral movement to reach the new location for the\nmachine.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0); text-align: justify;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>For the 2<sup>nd<\/sup> machine we repeat the same previous\nprocess.<\/p>\n\n\n\n\n<h2>Systems in use:<\/h2>\n<p><span style=\"color: rgb(0, 0, 0); font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span><span style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Skidding System.<\/span><\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Hydraulic Jacking System.<\/p>\n\n\n\n\n{&#8220;slider&#8221;:&#8221;21&#8243;,&#8221;temp-title&#8221;:&#8221;Lifting Deformed Slab #7&#8243;,&#8221;title&#8221;:&#8221;&#8221;}\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-48980","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/48980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/comments?post=48980"}],"version-history":[{"count":8,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/48980\/revisions"}],"predecessor-version":[{"id":49933,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/48980\/revisions\/49933"}],"wp:attachment":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/media?parent=48980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}