{"id":49492,"date":"2024-07-29T07:52:46","date_gmt":"2024-07-29T07:52:46","guid":{"rendered":"https:\/\/ft-eg.com\/?page_id=49492"},"modified":"2024-12-15T09:25:43","modified_gmt":"2024-12-15T09:25:43","slug":"lifting-deflected-slab","status":"publish","type":"page","link":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/lifting-deflected-slab\/","title":{"rendered":"Lifting Deflected Slab"},"content":{"rendered":"\n\n\n<h2>Lifting Deflected Slab<\/h2>\n<p style=\"font-size: large; font-family: Arial; color: rgb(255, 255, 255);\">Location:\nThe 5th Settlement, Cairo, Egypt<\/p>\n\n\n\n\n<h2>2024<\/h2>\n<h2>Year of completion<\/h2>\n\n\n<h2>Support then lift the deflected slab 20cm in\norder to return it to its original height.<\/h2>\n\n\n\n\n<h2>Lifted Slab Area:<\/h2>\n<h2>150 Sq.M<\/h2>\n\n\n<h2>Lifted Slab Weight:<\/h2>\n<h2>300 Tons<\/h2>\n\n\n\n\n\n\n\n<h2>Project Owner<\/h2>\n<h2>Contracting Company, Egypt<\/h2>\n\n\n\n\n<h2>Added Value to the\nCustomer:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Provide the best economic solution which saves time and money.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Full detailed load calculations and specific lifting points.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Flexible adaptation to high loads and\nconsidering the sensitive situation to avoid cracks for the existed slabs\nduring the lifting process.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Providing safe working areas and smooth access\nto all areas of operations by following all safety requirements during the\nstages of the work.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Preparing a detailed work methodology that\nrepresents the work steps according to the bridge drawings and loads.<\/p>\n\n\n\n\n<h2>Engineering Concept:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">In the shopping center project, a deflection of\n20 cm occurred for the slabs on two floors due to premature removal of formwork\nand non-casting of the boring strip. 300-tons is the overall weight of each\ndeflected slab.<\/p>\n\n\n\n\n<h2>Fast Track Solution:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\">Solution was applied in three phases:<\/p>\n<h2>Phase 1:<span style=\"color:#000000;\"> Back\nPropping System<\/span><\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>By using the Shorbrace system under each\ndeflected slab, and in addition to one more floor underneath. We placed the\nsystem spacing and grid sizes according to detailed loads calculations and\napproved drawings by consultant.<\/p>\n<h2>Phase 2:<span style=\"color:#000000;\"> Steel Structure Support System<\/span><\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>In between the back propping system, we\ninstalled a steel structure system consisting of hot-rolled sections and\nassembled as a frame system.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>It helped as additional support for the slab as\nwell as a lifting points to support the heavy lifting jacks and provide forces\nequilibrium.<\/p>\n<h2>Phase 3:<span style=\"color:#000000;\"> Lifting Process<\/span><\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>According to our calculations and design, we\nneeded 24 lifting points using 20 tons capacity jacks.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>To begin the process of lifting the 1<sup>st<\/sup>\nslab, we placed each jack at its own lifting point on the steel structure\nsupport system, then carefully began the lifting and blocking process.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>We repeated the same process continuously until\nwe reached the desired height, which returned the deflected slab to its correct\nposition. It was necessary to monitor the edge of the slab to ensure that\nnothing more than hairline cracks occurred.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>When we finished lifting the 1<sup>st<\/sup>\nslab, we waited for the main contractor to pour the boring stripe in addition\nto the consultant&#8217;s recommended days for the concrete to reach the appropriate\nstrength.<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>After that, we lift the slab to a very slight\nheight, so that we can remove the supports and blocks that were placed there.\nAlso, the steel structure and the back propping of the 1<sup>st<\/sup> slab were\nremoved as well.<\/p>\n<p style=\"font-size: large; color: rgb(0, 0, 0); font-family: Montserrat;\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Again, for the 2<sup>nd<\/sup> slab, we repeated\nthe exact same mentioned process.<\/p>\n\n\n\n\n<h2>Systems in use:<\/h2>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Steel Structure Support System<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Shorbrace System (As Back Propping)<\/p>\n<p style=\"font-size: large; font-family: Montserrat; color: rgb(0, 0, 0);\"><span style=\"font-family: Symbol; font-size: 18.6667px; text-indent: -24px;\">\u00b7&nbsp;<\/span>Hydraulic Lifting Jacks<\/p>\n\n\n\n\n{&#8220;slider&#8221;:&#8221;28&#8243;,&#8221;temp-title&#8221;:&#8221;Lifting Deflected Slab #28&#8243;,&#8221;title&#8221;:&#8221;&#8221;}\n\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"class_list":["post-49492","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/49492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/comments?post=49492"}],"version-history":[{"count":11,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/49492\/revisions"}],"predecessor-version":[{"id":49926,"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/pages\/49492\/revisions\/49926"}],"wp:attachment":[{"href":"https:\/\/ft-eg.com\/formwork\/scaffolding\/en\/solutions\/wp-json\/wp\/v2\/media?parent=49492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}